Project Detail

Reşadiye-3 HEPP is located in Reşadiye district of Tokat city. Deformations inside conveyance tunnel have been observed due to landslide.

Beray has to prepare Modeling of Landslide Runout, Conceptual Design Projects of Landslide Rehabilitation and Detailed Design Projects of Tunnel Rehabilitation by the signed contract.


  • Investor
  • Energo-Pro Reşadiye Hamzalı Elektrik Üretim San. Ve Tic. A.Ş.
  • Location
  • Reşadiye/ Tokat
  • Installed Power
  • 22.90 MW
  • Design Discharge
  • 60.00 m³/s
  • Net Head
  • 42.00 m
  • Contract Year
  • 2014
  • Services
  • FD
  • DD
  • Progress
  • Operation